ICAB Certificate Level - Accounting Exam System
Database-backed question bank & exam engine

Chapter 11: Provisions, Contingent Liabilities and Contingent Assets (IAS 37)

Recognition criteria for provisions; probability thresholds distinguishing provisions, contingent liabilities and contingent assets; measurement of provisions; disclosure requirements.

ICAB: 1. Maintaining financial records / 2. Adjustments  |  ACCA FA: Section D9: Provisions and contingencies  |  ICAEW: Area 2 / Area 3

227 / 5000 questions loaded

Question bank (page 6)

126. An entity is a defendant in a single legal claim brought by a customer, but the same underlying facts give rise to potential liability in three separate legal jurisdictions with materially different legal systems, precedents and burdens of proof, such that the probability of an adverse outcome genuinely differs between jurisdictions. How should the entity assess the probability of an outflow of resources for IAS 37 purposes?

A) Each jurisdiction's claim should be assessed independently based on that jurisdiction's own legal system and precedents, since the outcomes are not necessarily correlated despite the shared underlying facts.
B) Only the jurisdiction considered most favourable to the entity needs to be assessed, since a favourable outcome there would end the matter everywhere.
C) Only the jurisdiction considered least favourable to the entity needs to be assessed, on a most-prudent-outcome basis, ignoring the other two entirely.
D) The three jurisdictions' claims must always be aggregated into a single combined probability assessment, since they arise from one underlying set of facts.

Correct: A complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraphs 23-24

Where materially different legal systems can genuinely produce independent outcomes on the same underlying facts, each jurisdiction's exposure should be assessed on its own terms, using the evidence, precedents and burden of proof applicable in that jurisdiction, rather than being mechanically aggregated or reduced to a single most extreme case. The overall provision reflects the combination of these independently assessed exposures.

127. A levy imposed on entities in a particular sector is calculated by applying a fixed rate to the entity's total revenue for the preceding calendar year, but the obligating event specified in the legislation is simply carrying on the relevant activity at any point during the current calendar year. An entity carries on the activity throughout the current year. When does the liability for the levy arise, and does the fact that the levy amount is calculated from a prior year's revenue figure change this?

A) The liability arises progressively throughout the prior year, since that is the year whose revenue determines the amount payable.
B) The liability must be spread evenly across both the prior year and the current year, since both years are relevant to the levy calculation.
C) No liability can be recognised until the levy authority issues a formal assessment notice, irrespective of when the activity was carried on.
D) The liability arises in full at the point during the current year that the obligating event specified in the legislation, carrying on the activity, is triggered, regardless of which year's data is used to calculate the amount.

Correct: D complex IFRIC 21 Levies, paragraphs 8-9, applying IAS 37

Under IFRIC 21, the obligating event is the activity that triggers the levy as identified by the legislation, here carrying on the relevant activity during the current year, irrespective of the period used to calculate the levy's amount. Using a prior year's revenue merely as an input to measurement does not shift the timing of the obligating event itself; the liability is recognised only when that specified activity actually occurs in the current year.

128. As part of settling a regulatory investigation, an entity agrees to a consent order requiring it to engage and pay for an independent compliance monitor to oversee its practices for the following three years. The monitor's fees will be invoiced as services are performed over that future period. At the date the consent order becomes legally binding, how should the entity account for the future monitor's fees?

A) The full amount is expensed immediately as a fine, with no separate liability recognised in respect of the monitoring costs.
B) A contingent liability is disclosed only, since the amount cannot be estimated until each year's actual fees are invoiced.
C) A provision is recognised at the date the consent order becomes binding for the best estimate of the total future monitoring fees, since the obligation to engage and pay for the monitor crystallises at that point as a condition of the settlement, even though the services are performed later.
D) No liability is recognised at all until each year's monitoring services are actually performed, since these are future services not yet received.

Correct: C complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraphs 14, 17

The regulatory settlement itself is the obligating event: once the consent order becomes legally binding, the entity has a present legal obligation to incur the monitoring costs as an unavoidable condition of the settlement, distinguishing this from an ordinary future service contract entered into voluntarily. A provision is therefore recognised at that date for the best estimate of the monitor's total future fees, consistent with the general principle that a provision reflects an obligation from a past event even where the associated expenditure will be incurred later.

129. An entity recognises a material environmental remediation provision under IAS 37. A government agency separately awards the entity a non-repayable grant specifically to help fund the remediation work, conditional only on the work being carried out. How should the grant be presented in relation to the remediation provision?

A) The grant is credited immediately in full to retained earnings, bypassing profit or loss entirely, since it directly offsets a liability rather than an expense.
B) The grant is netted directly against the gross remediation provision, reducing the liability reported on the statement of financial position.
C) The grant is recognised as a separate item of income or deferred income under IAS 20, recognised on a systematic basis as the related remediation costs are recognised, without reducing the gross provision itself.
D) The grant is not recognised at all until the remediation work is fully completed and the provision has been utilised in its entirety.

Correct: C complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraph 54; IAS 20 Accounting for Government Grants and Disclosure of Government Assistance, paragraphs 12, 24

IAS 37 requires a provision to be presented gross, without netting against unrelated inflows, and reimbursement recognition principles under IAS 37 apply to reimbursements from a third party for the specific expenditure, not to funding support recognised under other standards. A government grant meeting IAS 20's recognition criteria is accounted for separately as income (or deferred income released to match the related costs), rather than being netted against the gross environmental provision, keeping the two items distinct in the financial statements.

130. A construction contract entitles the customer to liquidated damages of a fixed amount per week of delay, but the contract also specifies an overall cap on the total liquidated damages payable, regardless of how long the delay ultimately continues. At the reporting date, the project is already delayed and the entity expects the delay to continue well beyond the point at which the cap would be reached. At what amount should the liquidated damages provision be measured?

A) At the contractual maximum (capped) amount, since no amount in excess of that cap can ever become legally payable regardless of how long the delay continues.
B) At a discounted present value of the uncapped projected penalty, ignoring the existence of the cap entirely.
C) At zero, since the existence of a contractual cap means the liability is not yet sufficiently certain to be reliably estimated.
D) At the uncapped amount calculated by projecting the weekly penalty rate over the entity's full best estimate of the total expected delay period.

Correct: A complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraphs 36-37

A provision is measured at the best estimate of the expenditure required to settle the present obligation. Where a contractual cap fixes the maximum amount that can ever become payable, the best estimate cannot exceed that cap regardless of how the underlying uncapped calculation would otherwise develop, since no additional legal obligation exists beyond that ceiling. The provision is therefore measured at the capped amount once the delay is expected to reach or exceed the point at which the cap applies.

131. An entity recognises a gross product liability provision, together with a separate reimbursement asset for a virtually certain recovery from its insurer. It subsequently sells (assigns) that reimbursement receivable to a factor for immediate cash, retaining no further interest in its collection. How should the entity account for this sale, and what happens to the underlying gross provision?

A) The reimbursement asset is derecognised on sale to the factor, with any difference between the sale proceeds and its carrying amount recognised in profit or loss; the underlying gross product liability provision continues to be recognised in full, unaffected by the sale of the reimbursement asset.
B) Both the reimbursement asset and the underlying gross provision are derecognised together, since selling the right to recover extinguishes the entity's exposure to the whole matter.
C) The sale proceeds are netted directly against the gross provision, reducing the liability reported rather than being treated as a separate transaction.
D) The reimbursement asset cannot be sold separately from the provision it relates to, since IAS 37 does not permit assignment of insurance reimbursement rights.

Correct: A complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraph 53; IFRS 9 Financial Instruments, derecognition principles

The reimbursement asset and the underlying provision are two separate items: IAS 37 already requires the reimbursement to be recognised as a distinct asset rather than netted against the provision. Selling that separate asset to a factor is an ordinary derecognition event for the reimbursement receivable, with any gain or loss on sale recognised in profit or loss, but it has no bearing on the entity's own primary legal obligation to the claimant, which remains recognised in full as the gross provision.

132. Following widespread product complaints, an entity announces a voluntary customer compensation scheme, but the published terms explicitly and credibly state that the entity retains full discretion to amend, restrict or withdraw the scheme's terms at any time before individual customer claims are actually assessed and approved. At the reporting date, no individual claims have yet been assessed. Does a constructive obligation arise at the date of the announcement?

A) No, and no obligation can ever arise under this scheme even after it is later confirmed and individual claims are approved, since the original announcement itself was non-binding.
B) Yes, any public announcement of a compensation scheme automatically creates a constructive obligation for the full expected cost, regardless of any reserved discretion.
C) Yes, but only for the minimum amount the entity could not possibly reduce the scheme below, with the remainder treated as a contingent liability.
D) No, because the entity has not created a valid expectation that it will discharge its responsibilities under a specific, effectively irrevocable scheme; the genuinely retained and credible discretion to change or withdraw the terms before claims are assessed means no present obligation yet exists.

Correct: D complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraphs 10, 17

A constructive obligation requires that the entity has, through its actions, created a valid expectation on the part of other parties that it will discharge specific responsibilities, effectively leaving it with no realistic alternative but to settle. Where the entity has genuinely and credibly reserved unilateral discretion to change or withdraw the scheme before claims are assessed, no such valid expectation of a specific, unavoidable outcome yet exists, so no provision is recognised at the announcement date; a provision would instead arise later, once that discretion is effectively removed, for example when individual claims are approved.

133. A newly enacted levy applies annually to any entity that holds a specified regulatory licence on a fixed date each year, 1 October. The full annual levy becomes payable regardless of how long the licence is subsequently held during the remainder of the year. An entity holds the licence on 1 October, then voluntarily surrenders it the very next day. Does the entity have a liability for the full annual levy?

A) Yes, the full annual levy liability arises in its entirety on 1 October, the date the obligating event specified in the legislation, holding the licence on that date, occurs; the subsequent voluntary surrender the next day does not reduce or eliminate that already-crystallised obligation.
B) No liability arises at all, since the licence was surrendered almost immediately after the specified date and the entity will derive negligible benefit from it for the remainder of the year.
C) A liability accrues progressively over the year and should be reversed proportionately once the licence is surrendered.
D) No liability arises until the regulator issues a formal invoice, irrespective of when the specified licence-holding date occurs.

Correct: A complex IFRIC 21 Levies, paragraphs 8-11

Under IFRIC 21, the obligating event is whatever activity the legislation identifies as triggering payment, here simply holding the specified licence on the fixed date. Once that obligating event has occurred, the liability for the full levy is recognised in full at that point, since IFRIC 21 does not permit progressive accrual before the identified triggering activity nor reversal after it. Voluntarily surrendering the licence the next day is irrelevant, because the obligating event has already been completed.

134. New data protection legislation requires an entity to permanently delete certain categories of customer data once the specific purpose for which it was collected has ended, at the entity's own cost of running a dedicated data destruction exercise across multiple legacy systems. At the reporting date, the specified purpose has already ended for a substantial, identifiable population of records, and the entity has a legal obligation to complete the deletion exercise. How should the expected cost of the exercise be treated?

A) As a reduction directly against the carrying amount of the data itself, since data assets are not separately recognised under IFRS.
B) As a contingent liability only, disclosed but not recognised, since the exact systems affected and precise cost cannot be known with certainty until the exercise physically begins.
C) As a provision, since a present legal obligation exists at the reporting date, arising from a past event (collection of the data and the ending of the specified purpose), for which a reliable estimate of the required expenditure can be made.
D) No liability of any kind arises until the regulator actually issues a formal enforcement notice requiring the deletion to take place.

Correct: C complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraphs 14, 17

The obligating event, the specified data purpose ending while a legal deletion requirement already applies, has already occurred at the reporting date, giving rise to a present legal obligation independent of the entity's future conduct. Provided a probable outflow and a reliable estimate exist, this meets IAS 37's recognition criteria and is recognised as a provision, in the same way as any other legally mandated cost triggered by a past event, rather than merely disclosed or deferred until enforcement action is taken.

135. During excavation work for a new building, an entity discovers a site of archaeological significance. Local heritage law immediately requires the entity, at its own cost, to fund a professional survey and, if significant finds are confirmed, a formal preservation or relocation of the site before construction may continue. At the reporting date, the discovery has already been made and the legal requirement to fund the survey has already been triggered. How should the expected survey cost be accounted for?

A) No obligation of any kind arises until the heritage authority has completed and published its own final assessment of the site's significance.
B) As part of the cost of the building under construction, capitalised in full as an addition to the asset's cost rather than expensed or provided for as a liability.
C) As a contingent liability only, since the ultimate outcome of the survey, and therefore whether any further preservation costs will follow, remains genuinely uncertain.
D) As a provision, since the discovery itself (a past event) has already triggered a present legal obligation to fund the survey, independent of the entity's future conduct or its decision whether to continue construction.

Correct: D complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraphs 14, 17

The discovery has already occurred and the heritage legislation already legally requires the entity to fund the survey regardless of what the entity itself might prefer, meaning a present legal obligation exists from a past event at the reporting date. The survey cost itself, being probable and reliably estimable, is recognised as a provision; only costs genuinely dependent on an as-yet-undetermined future outcome, such as further preservation work contingent on the survey's findings, would instead remain a contingent liability disclosed rather than recognised at this stage.

136. A group insures a portion of its product liability risk through its own wholly owned captive insurance subsidiary, which in turn purchases external reinsurance only above a certain retention level. In the parent's consolidated financial statements, how should the group's overall product liability exposure be presented, given that the captive is a wholly owned subsidiary within the group?

A) The provision is split equally between the operating entity and the captive subsidiary in the consolidated accounts, reflecting the internal risk-sharing arrangement.
B) The group recognises the full gross product liability provision at the consolidated level, since the captive is not an independent third party from the group's perspective and any intra-group insurance arrangement is eliminated on consolidation; only genuine external reinsurance above the retention level is treated as a third-party reimbursement.
C) No provision is required at the consolidated level at all, since the risk has already been formally transferred to the captive subsidiary under an insurance contract.
D) The group presents only the net exposure retained after the captive's own internal insurance arrangement, since the captive has formally accepted the risk from the operating entity.

Correct: B complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraph 53; IFRS 10 Consolidated Financial Statements, intra-group elimination principles

A captive insurer within the same group is not an independent third party from the perspective of the consolidated group; intra-group insurance premiums, recoveries and any related internal reimbursement asset are eliminated on consolidation, since the group as a whole cannot insure itself. The full gross exposure is therefore recognised as a single consolidated IAS 37 provision, with only genuine external reinsurance recoveries above the captive's retention treated as a reimbursement asset from an independent third party.

137. A manufacturer offers a warranty on a durable product that, by its terms, automatically transfers to any subsequent owner if the original customer resells the product, with the manufacturer remaining obligated for the remaining warranty period regardless of who currently owns the item. In estimating its warranty provision, should the manufacturer distinguish between products still held by their original purchaser and products that have already been resold to a new owner?

A) A separate, additional provision must be recognised at the point of each individual resale, on top of the original warranty provision already recognised at the point of original sale.
B) Yes, only products still held by their original purchaser should be included in the provision, since the manufacturer's relationship with subsequent owners is too remote to constitute a present obligation.
C) No, the manufacturer's obligation runs with the product itself rather than with any particular owner, so the provision should be estimated for the entire expected population of products still within their warranty period, regardless of subsequent resale.
D) The provision should be reduced by half for any product known to have been resold, reflecting a reduced likelihood of a claim being made.

Correct: C complex IAS 37 Provisions, Contingent Liabilities and Contingent Assets, paragraphs 14, 24, 39

Because the warranty obligation is a term of the original sale that automatically transfers with the product rather than attaching to a specific customer, the manufacturer's population of obligations is the total number of units still within their warranty period, irrespective of resale. The obligating event, the original sale with the warranty attached, occurred once; resale to a new owner does not create a new obligation, so no separate additional provision is recognised at the point of resale, and the original population-based provision is not artificially reduced for resold units.

138. A Takaful (Islamic insurance) operator manages participants' contributions under a Wakala (agency) model, where the operator charges a fixed agency fee and any deficit in the participants' risk fund (after claims exceed contributions and investment income) must, under the scheme's own rules and regulatory practice, be covered by an interest-free loan (Qard Hasan) from the operator's own shareholders' fund, repayable only from future surpluses of the participants' fund. At year end, the participants' risk fund shows a deficit. How should the operator's shareholders' fund treat this obligation?

A) The deficit is written off immediately as an irrecoverable donation to policyholders, with no receivable recognised at all
B) The operator's shareholders' fund recognises a provision for the Qard Hasan funding obligation to the extent the deficit is probable to require funding and reliably estimable, since the scheme's own rules create a present constructive (if not strictly legal) obligation on the shareholders' fund to make good the deficit, while the resulting Qard Hasan is simultaneously recognised as a receivable from the participants' fund (recoverable only from future surpluses, and assessed for expected credit loss accordingly)
C) No provision is recognised, since the participants' fund is a legally and financially separate fund from the shareholders' fund with no cross-liability
D) The shareholders' fund capitalises the deficit funding as an intangible asset representing future Takaful business goodwill

Correct: B difficult IAS 37 - Takaful operator Qard Hasan deficit-funding provision under a Wakala model

Under the Wakala Takaful model, the operator's own established practice and regulatory framework of funding participants' fund deficits via Qard Hasan creates a present constructive obligation on the shareholders' fund once a deficit is probable and estimable, meeting IAS 37's provision recognition criteria; the corresponding Qard Hasan advanced is recognised as a receivable from the participants' fund, subject to its own recoverability assessment given repayment depends entirely on uncertain future surpluses.

139. Following a series of fatal industrial accidents across the RMG (garment) export sector, an international buyers' coalition establishes a mandatory factory safety inspection and remediation programme (an Accord/Alliance-style scheme). A garment exporter's factory is inspected and issued a detailed corrective action plan (CAP) specifying exact structural and fire-safety remediation works, with a fixed compliance deadline; failure to complete the CAP results in the exporter losing its buyers' orders entirely. At year end, the CAP has been issued and accepted by the factory but the remediation work has not yet started. Should a provision be recognised?

A) No provision is recognised until the remediation work actually begins, since no cash has yet been spent
B) The remediation cost is treated as a capital commitment disclosed in the notes only, since it relates to future capital expenditure on the factory building
C) A provision is recognised only for the portion of works that are legally mandated by government regulation, with buyer-imposed requirements excluded entirely regardless of their commercial force
D) Yes - the CAP being issued and formally accepted, combined with the severe and near-certain commercial consequence (total loss of buyer orders) of non-compliance, creates a present constructive obligation to carry out the specified remediation works, meeting IAS 37's probable-outflow and reliable-estimate criteria based on the CAP's own detailed costed scope, even though the entity could theoretically choose non-compliance and simply lose its buyers

Correct: D difficult IAS 37 - RMG factory safety remediation constructive obligation, corrective action plan acceptance as obligating event

A present obligation can be constructive rather than strictly legal, arising where an entity's own established pattern or a binding external commercial mechanism (here, acceptance of a detailed, costed corrective action plan under an industry-wide safety scheme with severe, near-certain commercial consequences for non-compliance) creates a valid expectation that the entity will carry out the specified actions; the acceptance of the CAP itself, not merely the commencement of physical works, is the obligating event, and a provision is recognised for the CAP's own costed remediation scope once the outflow is probable and reliably estimable.

140. A jurisdiction enacts a new Digital Services Tax (DST) law, imposing a levy on a specified percentage of in-scope digital platform revenue earned from users located in that jurisdiction, with the obligating event defined in the legislation as the earning of in-scope revenue during the calendar year (not a snapshot date). At the entity's interim reporting date (mid-year), it has already earned a portion of the year's expected in-scope revenue. How should the entity account for the DST at the interim date under IFRIC 21 principles?

A) A liability is recognised at the interim date for the DST applicable to the in-scope revenue ALREADY earned to that date, since the legislation's own obligating event (earning in-scope revenue) occurs progressively throughout the year as revenue is earned, distinguishing this levy from one whose obligating event is instead a single specified date (such as holding a licence on a fixed date), which would not permit progressive recognition
B) The full annual DST liability is recognised in full at the very start of the year, since the entity knows it will conduct in-scope activity throughout the year
C) The DST is treated as an income tax within the scope of IAS 12 rather than IFRIC 21, since it is described as a 'tax' in its title
D) No liability is recognised at the interim date at all, since the DST is an annual levy only finally determined at year end

Correct: A difficult IFRIC 21 - Digital Services Tax, progressive obligating event based on revenue earned

IFRIC 21 requires the obligating event for a levy to be identified from the specific legislation creating it; where a levy's obligating event is defined as the progressive earning of specified revenue throughout a period (rather than a single specified date, such as holding a licence or carrying on an activity on a fixed date), the liability is recognised progressively as that revenue is earned, consistent with the general principle that the obligating event - not merely the calculation period - determines the timing of recognition, and a levy calculated on revenue is not automatically an income tax within IAS 12's scope merely because of its name.

141. An entity participates in a mandatory carbon emissions trading scheme requiring it to surrender one tradeable emissions allowance for each tonne of CO2 it emits during the compliance year, with surrender due shortly after year end. By the reporting date, the entity has emitted more CO2 than the free allowances it was granted by the regulator, and must purchase additional allowances on the open market to cover the shortfall. How should this shortfall be treated at the reporting date?

A) The shortfall is disclosed as a contingent liability only, since the entity retains the choice of exactly when to purchase the additional allowances
B) A provision (or, under some acceptable accounting policies, a liability measured similarly) is recognised at the reporting date for the shortfall in allowances relative to actual emissions to that date, measured at the market price of allowances needed to cover the shortfall, since the obligation to surrender allowances for emissions already produced is a present obligation arising from a past event (the emissions themselves), with the cost reliably estimable by reference to observable market allowance prices
C) No liability is recognised until the additional allowances are actually purchased and physically surrendered to the regulator
D) The shortfall is netted against the fair value of the entity's own free allowances already held, with no separate liability recognised as long as total allowances held are non-negative

Correct: B difficult IAS 37 (by analogy) - emissions trading scheme allowance shortfall liability, market price measurement

Although IFRS lacks a single dedicated standard for emissions trading schemes, the generally accepted approach recognises a liability (commonly a provision, though practice varies) for the obligation to deliver allowances covering emissions already produced but not yet covered by allowances held, since the obligating event is the entity's own past emission activity and the cost is reliably measurable by reference to the observable market price of allowances, consistent with IAS 37's underlying recognition principles even though the entity retains discretion over exactly when it executes the market purchase.

142. A riverside industrial facility is notified by the local land authority that ongoing river erosion (a recurring natural phenomenon in the region) is expected to reach and require relocation of part of its facility within the next two to three years, and that under the applicable land acquisition and compensation framework, the entity will be entitled to receive government compensation for the affected land and structures, while separately bearing its own relocation costs for plant and equipment. How should the entity treat the ANTICIPATED RELOCATION COSTS (as opposed to the compensation receivable) at the current reporting date?

A) A provision is recognised for 50% of the estimated relocation cost, reflecting the balance of probability that the relocation will proceed within the estimated window
B) A full provision for the anticipated relocation costs is recognised immediately, since the erosion and eventual relocation are highly likely to occur based on established riverbank patterns
C) The anticipated relocation costs are recognised as an intangible asset representing the entity's right to future compensation
D) No provision is recognised for the anticipated relocation costs at the current reporting date, because there is, as yet, no present obligation arising from a past event - the entity has not yet been compelled to relocate, no binding order or detailed relocation plan with a valid expectation created in others exists yet, and the mere expectation of a probable FUTURE event (erosion reaching the facility) does not by itself create a PRESENT obligation; this is distinguished from a decommissioning provision, which arises from the entity's own past installation of an asset, not from a future external environmental event

Correct: D difficult IAS 37 - anticipated river-erosion relocation, no provision absent a present obligation from a past event

IAS 37 requires a PRESENT obligation arising from a PAST event, not merely a probable future event; the expectation that river erosion will eventually necessitate relocation, however likely based on established geographic/environmental patterns, does not by itself create a present obligation for the entity to incur relocation costs - there is no past event that has already obligated the entity to relocate (no formal order has yet been issued, no detailed plan has yet been communicated creating a valid expectation in others), so no provision arises until a genuine present obligation crystallises, illustrating the general distinction between recognising for probable future costs versus a genuine obligating past event.

143. A cryptocurrency exchange operator's smart contract governing a specific token's staking pool is exploited by an attacker, resulting in a loss of customer-deposited tokens from that pool. The exchange publicly announces, before year end, that it will fully reimburse all affected customers from its own corporate treasury, regardless of any legal obligation to do so, to preserve its reputation and regulatory standing. Does this public announcement create a provision at the reporting date?

A) No, since the exchange has no strict legal obligation to reimburse customers for losses caused by a third-party attacker exploiting the smart contract's own code
B) The announcement is treated purely as a subsequent, non-adjusting disclosure matter with no provision recognised regardless of timing, since cryptocurrency losses are inherently outside the scope of IAS 37
C) A provision is recognised only once each individual customer has submitted and had approved a formal reimbursement claim, since until then the obligation remains merely possible
D) Yes - the exchange's own unambiguous public announcement of an unconditional intention to reimburse affected customers creates a constructive obligation, since it creates a valid expectation in those customers that the exchange will discharge that responsibility, and the exchange has little realistic alternative but to follow through once the announcement has been made, even though no strict legal liability exists; the provision is measured at the best estimate of the reimbursement cost

Correct: D difficult IAS 37 - constructive obligation from a public reimbursement announcement, cryptocurrency exchange exploit

A constructive obligation arises from an entity's own past actions - such as an established pattern of past practice, published policies, or a sufficiently specific current statement - that create a valid expectation in other parties that the entity will discharge particular responsibilities; a clear, public, unconditional commitment to reimburse affected customers, made before year end, creates exactly this kind of constructive obligation regardless of the absence of a strict legal duty, and a provision is recognised at the best estimate of the reimbursement cost, to the extent the announcement leaves the entity with no realistic alternative but to follow through.

144. A social media platform operator is found, following a formal regulatory investigation that concludes and issues a binding finding before year end, to have breached content moderation obligations under a new online safety law; the regulator's binding finding specifies that a financial penalty will be levied, with only the exact final amount (within a stated statutory range) still to be formally calculated and issued after year end. How should the entity treat this at the reporting date?

A) No provision is recognised until the regulator issues the final, precisely calculated penalty notice, since the exact amount is not yet known
B) A provision is recognised at the reporting date at the entity's own best estimate within the statutory range specified by the regulator's binding finding, since the obligating event (the regulator's binding finding of breach) has already occurred before year end, and a reliable estimate can be made using the statutory range and the entity's own knowledge of the specific circumstances of the breach, even though the regulator's own precise final figure is issued only afterwards
C) A provision is recognised for the maximum amount in the statutory range as a matter of prudence, regardless of the specific circumstances of the breach
D) The matter is disclosed only as a contingent liability, since penalties under a still-developing new law are inherently too uncertain to estimate

Correct: B difficult IAS 37 - content moderation regulatory penalty, provision at best estimate within statutory range

Once a regulator has issued a binding finding of breach before the reporting date, a present obligation exists, and the fact that only the precise final penalty figure (within an already-known statutory range) remains to be calculated does not preclude recognition - IAS 37 requires only a reliable estimate, not certainty, and the entity's own best estimate within the known range, informed by its knowledge of the specific circumstances, is used, consistent with the general principle that some estimation uncertainty does not itself justify treating a probable, reliably estimable obligation as a mere disclosed contingency.

145. A mobile financial services (MFS) provider's agreement with its independent cash-in/cash-out agents entitles the provider to claw back previously paid commission from an agent where, on a subsequent post-transaction audit, a transaction is found to have violated the provider's anti-fraud protocols; at year end, an ongoing but incomplete post-transaction audit programme has already identified a number of violating transactions for which the clawback has not yet been processed, and management estimates, based on the audit programme's own findings to date and its established historical detection rate, that further violations will be identified once the audit is complete. Should a liability (a negative-commission clawback provision, effectively a reduction of the agent's own receivable/payable position) be recognised for the ESTIMATED FURTHER violations not yet individually identified?

A) A liability is recognised for the full population of all transactions processed by that agent during the year, on the conservative assumption that all of them may eventually be found to violate the protocols
B) No, a clawback adjustment is recognised only for the specific transactions individually confirmed as violations at the reporting date, with no adjustment for merely anticipated further findings
C) Yes - where the provider has reliable historical evidence (its own established detection rate from the ongoing and completed portions of similar audit programmes) supporting a probable further clawback beyond the transactions already individually identified, a best-estimate adjustment is recognised for the additional expected clawback, consistent with the general principle that a provision for a large population of similar items can be estimated using a statistical/expected-value approach even before every individual item is separately identified
D) The estimated further violations are disclosed only as a contingent liability, since audit-based fraud estimates are inherently too subjective for recognition under any circumstances

Correct: C difficult IAS 37 - MFS agent commission clawback, expected-value estimate using historical audit detection rate

Consistent with IAS 37's expected-value approach for a large population of similar obligations (as applied, for example, to warranty provisions), where an entity has reliable historical evidence of a detection/violation rate from an ongoing or comparable audit programme, a best estimate of further expected clawbacks beyond the individually identified transactions is recognised, since the underlying obligation (recovering commission improperly paid on protocol-violating transactions) is probable in aggregate and reliably estimable using that evidence, even though the identity of each individual further violating transaction is not yet separately known.

146. A garment exporter's largest overseas buyer requires, as a condition of continuing to place orders, that all suppliers in its chain complete a human rights and environmental due diligence programme under the buyer's own supply chain policy (mirroring emerging mandatory due diligence legislation in the buyer's home jurisdiction), including specific, costed remediation of identified deficiencies at the exporter's own factories. The exporter has received the buyer's detailed remediation requirements and, while not legally compelled by any law directly applicable to itself, would lose this buyer's business entirely (a large majority of its total revenue) if it does not comply. Should a provision be recognised for the remediation costs?

A) A provision is recognised only for the specific remediation items that also happen to be independently required by the exporter's own domestic law, with all buyer-specific requirements excluded regardless of their commercial force
B) The remediation cost is capitalised as an intangible customer relationship asset rather than expensed as a provision
C) No, since the exporter itself is not directly subject to any due diligence law, and a purely commercial (contractual/customer-driven) requirement can never create an IAS 37 obligation
D) Yes - although no law directly binds the exporter, the buyer's detailed, costed remediation requirements, combined with the severe and near-certain commercial consequence of non-compliance (loss of the large majority of revenue), leave the exporter with no realistic alternative but to carry out the remediation, creating a constructive obligation with a probable outflow reliably estimable from the buyer's own costed requirements

Correct: D difficult IAS 37 - supply chain due diligence remediation, constructive obligation from customer-imposed requirements

A present obligation under IAS 37 need not derive from law; it can be constructive, arising where an entity's own circumstances (here, a customer's detailed, costed remediation requirements combined with a severe and near-certain commercial consequence of non-compliance that leaves no realistic alternative) create a valid expectation that the entity will carry out specific actions, exactly as tested for buyer-imposed factory safety programmes - a purely contractual/commercial driver can create a genuine constructive obligation where it is, in substance, as compelling as a legal one.

147. A telecommunications regulator requires all licensed operators to contribute to a Universal Service Fund (USF), calculated as a fixed percentage of each operator's own annual net revenue, to subsidise telecom access in underserved rural areas; the obligating event under the regulation is defined as generating net revenue during the calendar year. At the entity's reporting date (which coincides with the calendar year end), the entity has generated its full year's net revenue, but the regulator's own formal USF assessment notice, confirming the precise amount due, is not issued until several months into the following year. Should a liability be recognised at the reporting date?

A) Only 50% of the estimated USF liability is accrued, reflecting the uncertainty inherent in awaiting the regulator's formal notice
B) Yes - the obligating event (generating net revenue during the calendar year) has been fully completed by the reporting date, so the full liability for the year's USF contribution is accrued at the entity's own best estimate, calculated by applying the known statutory percentage to the entity's own already-finalised net revenue figure, with the regulator's later formal notice being merely an administrative confirmation rather than the event that creates the obligation
C) The USF contribution is treated as a voluntary payment recognised only when actually remitted to the fund, since the fund is described as supporting a discretionary social programme
D) No, since the regulator's own formal assessment notice is a precondition to any liability existing at all

Correct: B difficult IFRIC 21 - Universal Service Fund levy, obligating event complete at year end, accrued before formal notice

Under IFRIC 21, the obligating event for this levy is the generation of net revenue during the calendar year, which is already complete by the reporting date; the levy is therefore recognised in full at the reporting date at the entity's own best estimate using the known statutory percentage and its own finalised revenue figure, with the regulator's subsequent formal assessment notice serving only as an administrative confirmation (to which the accrual is trued up if it differs), rather than being the obligating event itself.

148. A data centre operator is subject to a new environmental levy calculated on its facilities' actual electricity consumption above an efficiency benchmark (a Power Usage Effectiveness, or PUE, threshold) measured over each calendar year, with the obligating event defined in the enabling legislation as electricity consumption above the benchmark occurring during the year. At the entity's half-year interim reporting date, actual consumption to date is already tracking above the annualised benchmark threshold. How should the entity treat this levy at the interim date?

A) A liability is recognised at the interim date for the levy applicable to the excess consumption already incurred to that date above the pro-rata portion of the annual benchmark, since the obligating event (consumption above the benchmark) occurs progressively as excess consumption is actually incurred, consistent with the general IFRIC 21 principle that a levy is recognised as its own specific obligating event occurs, using the best information available at the interim date, including a reasonable pro-rating of the annual benchmark
B) No liability is recognised at the interim date, since the annual benchmark comparison can only be finally determined at the full year end
C) The levy is treated as a capitalised addition to the cost of the data centre's own electrical infrastructure rather than as a period liability
D) The full estimated annual levy is recognised in its entirety at the interim date, since the trend to date suggests the annual benchmark will certainly be exceeded

Correct: A difficult IFRIC 21 - data centre PUE-based environmental levy, progressive recognition against a pro-rated benchmark

Where a levy's obligating event is defined by reference to an activity measure (here, electricity consumption above a benchmark) that occurs progressively throughout the year, the liability is recognised progressively as the excess consumption is actually incurred, using the best available information at each reporting date, including an appropriate pro-rating of the annual benchmark threshold to the interim period, consistent with IFRIC 21's general approach to levies whose obligating event accrues over time rather than crystallising only at a single point.

149. During a routine on-site inspection, Bangladesh Bank's examiners identify specific anti-money laundering (AML) compliance deficiencies at a commercial bank and, before the bank's year end, issue a formal written directive imposing a monetary penalty for the deficiencies identified, with the exact amount stated in the directive itself and payable within a specified period. How should the bank treat this at its reporting date?

A) No liability is recognised until the bank has made its first instalment payment toward the penalty
B) The penalty is disclosed only as a contingent liability, since regulatory penalties are inherently uncertain until the bank has exhausted any available right of appeal
C) A provision (or, given the penalty amount is already precisely and formally stated in a binding directive issued before year end, more appropriately a straightforward accrued liability) is recognised in full at the reporting date, since the obligating event (the regulator's formal directive) has already occurred and the amount is not merely estimated but precisely known from the directive itself
D) The penalty is netted against the bank's regulatory capital directly in equity, bypassing profit or loss entirely, since it originates from a capital-adequacy-related inspection

Correct: C difficult IAS 37 - Bangladesh Bank AML compliance penalty, liability recognised on formal precisely-quantified directive

Once a regulator has issued a formal, binding directive specifying a precise monetary penalty before the reporting date, a present legal obligation exists with an amount that is not merely estimated but exactly known, so the liability is recognised in full at the reporting date; an available right of appeal against the directive does not, by itself, prevent recognition unless success on appeal is more likely than not (in which case a lower best estimate, or no liability, might instead be appropriate based on the specific facts), but a straightforward binding directive with a stated amount and no active appeal is recognised as an accrued liability in the ordinary way.

150. An agricultural insurer offers parametric (weather-index) crop insurance policies that pay out automatically based on an objective, independently-published rainfall index reading for a defined region and period, rather than on individually assessed actual crop damage. Shortly before year end, the published rainfall index for the current season falls below the contractual trigger threshold for a specific region, automatically triggering payout obligations to all policyholders in that region under the policy terms, though the insurer has not yet processed or paid any individual claims. How should the insurer treat this at year end?

A) No liability is recognised until each individual policyholder in the affected region submits a formal claim, since a claims process is always required regardless of the trigger mechanism
B) A liability is recognised only for the specific policyholders who happen to have already contacted the insurer proactively before year end
C) A liability (an insurance claims liability, effectively a provision under the underlying obligating-event principle) is recognised for the full population of policyholders in the triggered region at the reporting date, since the objective, independently-published index reading falling below the contractual threshold is itself the obligating event under the parametric policy terms, automatically crystallising the payout obligation without requiring any individual damage assessment or claim submission
D) The payout obligation is treated as a contingent liability disclosed in the notes only, since the actual extent of each individual farmer's crop damage remains factually unverified

Correct: C difficult IAS 37 (by analogy)/insurance contract principles - parametric weather-index insurance, obligating event at index trigger

Under a genuine parametric (index-based) insurance structure, the obligating event is the objective index reading itself crossing the contractual trigger threshold, not an assessment of each individual policyholder's actual loss - this is the entire structural point of parametric insurance, designed to avoid lengthy individual claims assessment; once the published index for the region has crossed the threshold before year end, the payout obligation for the full population of policyholders in that region has already crystallised and is recognised in full, reliably estimable from the policies' own fixed payout terms.

« Prev Next »